Radmile Matejčić 10, HR-51000 Rijeka, Croatia
+385 98 98 69 662
info@ster.hr

News

Installation of SterPMU-R1 rack mounted units in various Croatian transformer stations

During the last two years, more than 20 SterPMU-R1 devices have been installed on 400kV and 220kV lines and on 110kV busses critical for power evacuation from the most problematic point in transmission system: TE Plomin, HE Zakučac and HE Peruća and wind park Vrataruša. Primary Ethernet communication is used for PDC running WAM algorithms…
Read more

Elia Grid will be utilizing SterPMU portable PMU devices for various measurement campaigns

Two portable units were delivered to Elia Grid’s Power System Operations & Security Department. Measurement campaigns on several locations will be conducted with goal to check performance of power producers and to detect power oscillations that cannot be captured with SCADA or other installed DFR devices.

20 WAMSTER devices installed in Oman

Portable wide area monitoring system consisting of 20 SterPMUs was formed in Oman in July 2016. WAMS campaign is a part of a consultancy project conducted by Tractebel Engineering, Dubai branch, for Oman Electricity Transmission Company (OETC), Muscat. The goal of measurement campaign is providing synchrophasor data for gaining inside into OETC system dynamics and…
Read more

WAMSTER installed as a wireless WAMS bridge in India

Two portable PMUs were installed at SUZLON‘s windfarm at Kaladungar, Jaisalmer, Rajasthan, one PMU at National Institute of Wind Energy (NIWE) Wind Turbine Test Station, Kayathar, Tamil Nadu and a dedicated WAMSTER server installed in Power System Operation Corporation Limited (POSOCO), New Delhi have been forming a dedicated WAMS since December 2015 as a part of a wind…
Read more

WAMSTER devices installed in INA RNR Urinj

INA-Industrija nafte, d.d. (INA, d.d.) is a medium-sized European oil company and a leading company in Croatian oil business. A fuel refinery plant INA RNR located in Urinj has three generator sets (10MVA, 25MVA, 26 MVA) to ensure reliable power supply to important elements of the oil refinery process and prevent their unplanned and sudden…
Read more

20 WAMSTER devices installed in UAE for our client Tractebel

As a part of the measurement campaign by our Belgian client Tractebel Engineering, twenty STER PMU devices were successfully installed in United Arab Emirates. Aim of the project is to collect synchronized measurements which will allow Tractebel to create a reactive power study and distribution load modeling for the UAE Abu Dhabi Transmission & Despatch Company (TRANSCO) and Abu Dhabi Water…
Read more

WAMSTER synchrophasor network installed on Seychelles

As a part of the Small Islands Developing States (SIDS DOCK) Project, several STER PMU devices were successfully installed in Seychelles for our German client Energynautics GmbH. The project consists of assessing grid absorption capacity, grid code, feed-in tariffs and model power purchase agreements for renewable energy systems. Full story is available on our Wamster…
Read more

Two WAMSTER devices installed in NIAF, Nigeria

In cooperation with KU Leuven, NIAF and Bauchi State University, Nigeria, two SterPMU devices were installed in Abuja, Nigeria, as a part of a bridging SCADA demonstration by Dr. Barry Rawn.

WAMSTER-2 funding received from Minpo

Fig.1. Croatian Ministry of Enterpreneurship and Crafts WAMSTER-2 project has received funding by the Croatian Ministry of Enterpreneurship and Crafts (MINPO), for the “Entrepreneurial impulse” program, Measure B: “Enhancing business competitiveness of entrepreneurs and craftsmen”, under category B3 “Encouraging innovative entrepreneurship”. The aim of the WAMSTER-2 project is to adapt the form factor of the…
Read more

STER Welding Monitor System implemented for SAIPEM Rijeka

Fig.1. SAIPEM Laboratory Rijeka STER Welding Monitor System was successfully implemented and delivered to our client, SAIPEM MEDITERRANEAN SERVICES Rijeka. SAIPEM R&D Laboratory in Rijeka will be using our measurement system during the next couple of months as a cost-effective solution for analyzing their welding procedures and improving them. Our engineers will be cooperating with…
Read more